56” Pipeline
IGAT II - Sec C
56” Pipeline
IGAT II - Sec C
Client:
Project Type:
Pipe Dimension:
Pipeline Length:
Project Start:
Project End:
Status:
NIOC
Gas Pipeline
56 Inch Pipe
107 Km
Sep 6, 1991
Mar 24, 1994
Complete
Project Description
The project includes complete civil and mechanical construction of 107 Km high pressure gas transmission of 5LX65 steel pipe. The project includes:
►Multiple river, road, flood way and stream crossings
►1 launching and receiving trap station
►6 block valve stations
►Cathodic protection system including test points and line markers
Except for the line pipe and welding electrodes, which were supplied by the client, Arvin Engineering was responsible for provision of consumables, and civil materials.