56” Pipeline
IGAT III - Phase 4
56” Pipeline
IGAT III - Phase 4
Client:
Project Type:
Pipe Dimension:
Pipeline Length:
Project Start:
Project End:
Status:
NIGC
Gas Pipeline
56 Inch Pipe
50 Km
May 5, 1999
Dec 1, 1999
Complete
Project Description
The project includes complete civil and mechanical work and full commissioning related to construction of 50 Km high pressure gas transmission of polyethylene coated pipeline with the wall thickness varying from 0.850 to 1.062 inches. The project includes:
►Multiple river, road, flood way and stream crossings
►2 launching and receiving trap stations
►Block valve stations
►Cathodic protection system including test points and line markers
Except for the line pipe and welding electrodes, which were supplied by the client, Arvin Engineering was responsible for provision of staff, labor, consumables, and civil materials.