56” Pipeline

IGAT III - Phase 5 - Sec 1

Home        Projects        Capacity        Contact Us

 
 

Project Description

he project includes complete civil and mechanical work and full commissioning related to construction of Phase 5 of the 100 Km high pressure gas transmission of 5LX65 steel polyethylene coated pipeline with the wall thickness varying from 0.850 to 1.062 inches.  The project includes:

Multiple river, road, flood way and stream crossings

2 launching and receiving trap stations

6 block valve stations

Cathodic protection system including test points and line markers

Except for the line pipe and welding electrodes, which were supplied by the client, Arvin Engineering was responsible for provision of consumables, and civil materials.

Client:               

Project Type:

Pipe Dimension:

Pipeline Length:

Project Start:   

Project End:    

Status:             

NIGC

Gas Pipeline

56 Inch Pipe

100 Km

Apr 12, 2000

Dec 28, 2001

Complete