56” Pipeline
IGAT III - Phase 6
56” Pipeline
IGAT III - Phase 6
Client:
Project Type:
Pipe Dimension:
Pipeline Length:
Project Start:
Project End:
Status:
NIGC
Gas Pipeline
56 Inch Pipe
107 Km
April 21, 2001
Dec 22, 2002
Complete
Project Description
The project includes complete civil and mechanical work and full commissioning related to construction of 107 Km high pressure gas transmission of 5LX65 steel polyethylene coated pipeline with the wall thickness varying from 0.850 to 1.062 inches. The project includes:
►32 river, road, flood way and stream crossings
►1 launching and receiving trap stations
►6 block valve stations
►Cathodic protection system including test points and line markers
Except for the line pipe, fittings, valves, and CP materials which were supplied by the client, Arvin Engineering was responsible for provision of consumables, and civil materials.