10” C5+ Pipeline
Refinery
10” C5+ Pipeline
Refinery
Client:
Project Type:
Pipe Dimension:
Pipeline Length:
Project Start:
Project End:
Status:
NIGC
Gas Pipeline
10 Inch Pipe
47 Km
Sep 4, 2002
Jan 28, 2003
Complete
Project Description
The project includes complete civil and mechanical work and full commissioning related to construction of 47 Km high pressure, 5LX52 steel polyethylene coated pipeline with the wall thickness of 0.250 inches. The project includes:
►29 river, road, flood way and stream crossings
►2 launching and receiving trap stations
►4 break and block valve stations
►Cathodic protection system including test points and line markers
Except for the line pipe, fittings, valves and CP materials which were supplied by the client, Arvin Engineering was responsible for provision of welding electrodes, radiography film, and civil materials.
ARVIN Engineering All Rights Reserved
Published 2011