10” C5+ Pipeline

Refinery

Home        Projects        Capacity        Contact Us

 

Client:               

Project Type:

Pipe Dimension:

Pipeline Length:

Project Start:   

Project End:    

Status:             

NIGC

Gas Pipeline

10 Inch Pipe

47 Km

Sep 4, 2002

Jan 28, 2003

Complete

 

Project Description

The project includes complete civil and mechanical work and full commissioning related to construction of 47 Km high pressure, 5LX52 steel polyethylene coated pipeline with the wall thickness of 0.250 inches.  The project includes:

29 river, road, flood way and stream crossings

2 launching and receiving trap stations

4 break and block valve stations

Cathodic protection system including test points and line markers

Except for the line pipe, fittings, valves and CP materials which were supplied by the client, Arvin Engineering was responsible for provision of welding electrodes, radiography film, and civil materials.