30” Pipeline
Kharmach / Shiraz
30” Pipeline
Kharmach / Shiraz
Client:
Project Type:
Pipe Dimension:
Pipeline Length:
Project Start:
Project End:
Status:
NIGC
Gas Pipeline
56 Inch Pipe
107 Km
June 2, 2003
Aug 8, 2004
Complete
Project Description
The project includes complete civil and mechanical work and full commissioning related to construction of 107 Km high pressure gas transmission of 5LX60 steel polyethylene coated pipeline with the wall thickness varying from 0.469 to 0.625 inches. The project includes:
►32 river, road, flood way and stream crossings
►2 launching and receiving trap stations
►2 block valve stations
►Cathodic protection system including CP stations, test points and line markers
Except for the line pipe, fittings and valves which were supplied by the client, Arvin Engineering was responsible for provision of consumables, welding electrodes, coating materials, CP. materials & equipment and all civil materials.