56” Pipeline
IGAT IV - Spread 5
56” Pipeline
IGAT IV - Spread 5
Client:
Project Type:
Pipe Dimension:
Pipeline Length:
Project Start:
Project End:
Status:
NIGC
Gas Pipeline
56 Inch Pipe
27 Km
June 2, 2003
Dec 11, 2004
Complete
Project Description
The project includes complete civil and mechanical work and full commissioning related to construction of 27 Km high pressure gas transmission of 5LX70 steel polyethylene coated pipeline with the wall thickness varying from 0.875 to 1.250 inches. The project includes:
►26 river, road, flood way and stream crossings
►1 launching and receiving trap stations
►1 block valve stations
►27 Km of 2” HDPE pipe installed parallel to pipeline for future optical fiber cable
►Cathodic protection system including CP stations, test points and line markers
Except for the line pipe, fittings and valves which were supplied by the client, Arvin Engineering was responsible for provision of consumables, welding electrodes, coating materials, CP. materials & equipment and all civil materials.