56” Pipeline
IGAT IV - Sec 11, 12 & 14
56” Pipeline
IGAT IV - Sec 11, 12 & 14
Client:
Project Type:
Pipe Dimension:
Pipeline Length:
Project Start:
Project End:
Status:
NIGC
Gas Pipeline
56 Inch Pipe
226 Km
Aug 8, 2005
Nov 19, 2007
Complete
Project Description
The project includes complete civil and mechanical work and full commissioning related to construction of 226 Km high pressure gas transmission of 5LX70 steel polyethylene coated pipeline with the wall thickness varying from 0.780 to 1.125 inches. The project includes:
►197 river, road, flood way and stream crossings
►2 launching and receiving trap stations
►5 line brake valve stations
►Installation of fiber optic cable
►Cathodic protection system including CP stations, test points and line markers
Except for the line pipe, fittings and valves which were supplied by the client, Arvin Engineering was responsible for provision of consumables, welding electrodes, coating materials, rock shield, CP. materials & equipment and all civil materials